NYC Equipment Delivery Checklist
Accurate delivery information helps prevent delays and makes it easier to match equipment and transportation to the jobsite. Requirements vary by borough, property, contractor, and project.
Information to send before dispatch
- Complete delivery address and borough
- Requested delivery and pickup dates and time windows
- Onsite contact name and phone number
- Entrance, gate, doorway, elevator, and aisle dimensions
- Loading, curb, dock, or staging instructions
- Equipment model or required height, reach, and capacity
- Surface, slope, overhead, and indoor-use conditions
Confirm project responsibilities
The customer and project team should confirm permits, street-use requirements, traffic control, flagging, building rules, union or site procedures, insurance documentation, operator qualifications, and any required inspections.
Before the equipment arrives
Clear and secure the delivery area, verify that the receiving contact is available, and report changes promptly. Do not operate equipment until required inspections, authorization, familiarization, and site controls are complete.
Review delivery coverage or request a quote.
